This method requires one to traverse through the lecture rooms off of the leading floor's remaining hallway and then with the basement (by way of the hole during the cafeteria floor) as a consequence of rubble blocking direct access to the staircase. During the basement, powering a doorway opened from http://aiden207v6ie9.targetblogs.com/profile