Ensure that the substrate is very well sealed and that every one hungry parts are resolved just before continuing to set up the technique. If the overcoating period of time with the primer is exceeded, the area ought to be evenly abraded and vacuumed prior to further coats are applied. https://mcgepoxycoatings.com/why-decorative-quartz-screed-works-wonders-for-hospitality-flooring/