In the beginning, the Jai Hind metro station was prepared for being elevated. Nonetheless, the AAI objected which the elevated stretch up for the airport may possibly pose a risk to plane, And so the route was further reworked and the station was shifted underground, a hundred and fifty m through https://altonm022cea1.loginblogin.com/profile