In the beginning, the Jai Hind metro station was planned to be elevated. Even so, the AAI objected which the elevated extend up into the airport might pose a threat to plane, Hence the route was additional reworked plus the station was shifted underground, 150 m through the Airport terminal building. https://railwaykolkata16048.newbigblog.com/39337844/railway-recruitment-kolkata-rrb-group-d-32000-vacancy-pdf